Success Stories
BRISTOL
Inframark realized substantial cost savings for Bristol, Va.
CLIENT SITUATION
Inframark has been responsible for the 15 million gallons per day (MGD) activated sludge wastewater treatment plant (WWTP) for Bristol, Tenn., and Bristol, Va., since 2007, successfully unseating an incumbent that had operated the regional WWTP since 1984. The WWTP required replacement of the aging aeration blowers, piping, and diffusers. Not only was the equipment becoming increasingly unreliable, but it was also energy inefficient. In addition to supplying air and mixing to the aeration basins, the old system also served as odor control for the foul air generated in the sludge holding tank. An issue quickly arose because the new blower manufacturer would not warranty the client’s equipment due to the high H2S levels in the foul air. The design engineers estimated it could add substantial cost to the project amount, plus ongoing operating expenses to install an odor control system. Also, the facility had periodically experienced illicit discharges of glycol into the collection system. These discharges resulted in plant operational problems and increased operating costs.
INFRAMARK SOLUTION
Inframark partnered with the client to operate and maintain the WWTP, hiring all staff and taking responsibility for compliance and asset management. In 2010, Inframark conducted a site energy management plan (SEMP) showing that the client could reduce electrical consumption by replacing the aging aeration blowers, installing fine bubble diffusers, and decommissioning the biotower. This led to a planned facility upgrade. We suggested installing a separate aeration system for the foul air using much smaller and less costly blowers and continue using the aeration basins for odor control. Inframark aided the client by reviewing the design and offering suggestions. In addition, Inframark and personnel from the client installed several portable samplers in strategic collection system locations to locate the illicit discharge source.
INFRAMARK RESULTS
Inframark consistently provides high-quality management and operation of the City of Bristol Tennessee’s wastewater treatment.
Success Stories
Learn more about our actions and progress toward building A Better World Together.
PROVEN PARTNERS
As a reliable partner to all of our customers, we focus on delivering industry-leading, value-added services in responsible manner. Every day across the U.S., our team of 3,000 water and wastewater experts, technologists and community champions work with our partners and each other to protect and replenish the world’s most critical resources through sustainable infrastructure — and we have a track record to prove it.
Contact Us
Let us bring our Quest for Excellence to your project.